Continuous improvement
A systematic, ongoing effort to find and implement small changes that enhance how resources are planned, assigned, and used. It relies on data and feedback to reduce waste, smooth flow, and raise performance over time.
Key Points
- Runs in short, repeatable cycles such as plan–do–check–act to steadily refine resourcing practices.
- Focuses on small, low-risk changes validated by evidence rather than sweeping transformations.
- Targets people, equipment, facilities, and vendor capacity, not only team processes.
- Uses clear metrics and baselines to track effects on throughput, quality, cost, and workload.
- Standardizes successful changes into procedures, calendars, and the resource management plan.
- Requires transparency, psychological safety, and leadership support to sustain momentum.
Purpose of Analysis
Identify where resource use creates delays, rework, or uneven workload, and choose focused actions that improve flow and predictability.
- Expose bottlenecks, queues, and overutilized roles that constrain delivery.
- Spot skill gaps, handoff friction, and tool or environment limitations.
- Balance cost, quality, and pace by reducing waste and smoothing demand.
- Strengthen team health by managing overtime and context switching.
Method Steps
- Set the aim and success measures, linking to resource objectives and constraints.
- Capture the current state: allocations, queues, cycle times, defects, and overtime.
- Map the workflow to see handoffs, wait states, and resource dependencies.
- Diagnose causes using simple root-cause tools and waste categories.
- Prioritize opportunities by impact versus effort, choosing one or two to test.
- Design a small experiment with clear owners, timeframe, and expected results.
- Implement the change and monitor leading and lagging indicators.
- Review outcomes against the baseline and decide to adopt, adapt, or drop.
- Standardize wins by updating calendars, SOPs, roles, and the resource plan.
- Share lessons learned and schedule the next improvement cycle.
Inputs Needed
- Resource calendars, assignments, and utilization reports.
- Time tracking, throughput, cycle time, and work-in-progress data.
- Quality data such as defects, rework rates, and escape ratios.
- Issue and risk logs related to capacity, skills, or vendor performance.
- Stakeholder and team feedback from reviews, retrospectives, and surveys.
- Process maps, SOPs, RACI charts, and skills matrices.
- Budget, cost performance data, and supplier SLAs or performance reports.
- Tool and environment telemetry, queue lengths, and incident tickets.
Outputs Produced
- An improvement backlog with prioritized experiments and owners.
- Action items and change requests to adjust staffing, tools, or processes.
- Updated resource management plan, calendars, and assignment rules.
- Revised SOPs, process maps, and RACI or skills development plans.
- Refreshed dashboards and KPIs with new baselines and targets.
- Documented lessons learned and a communication summary to stakeholders.
Interpretation Tips
- High utilization with long cycle times often signals a bottleneck that needs capacity or workflow changes.
- Rising work-in-progress usually predicts delays and quality issues; limit WIP to stabilize flow.
- Frequent overtime points to systemic demand–capacity mismatch, not individual performance.
- Track both leading indicators (WIP, queue time) and lagging results (defects, schedule variance).
- Beware of vanity metrics; use measures tied to customer value and delivery predictability.
- Avoid local optimization that harms the overall system; view cross-team effects before locking changes.
Example
A development team experiences long test queues and weekend work. Data shows testers are over 95% utilized, with high rework and environment wait time.
The team pilots shift-left practices, pairs developers with testers for critical stories, and prebooks test environments. They cap WIP and add a part-time contractor during peak weeks.
Within three iterations, average lead time drops 25% and overtime decreases. The team updates SOPs, the resource calendar, and the resource management plan to standardize the changes.
Pitfalls
- Treating it as a one-off workshop instead of an ongoing cadence.
- Launching big-bang changes without a baseline or experiment design.
- Failing to standardize and document successful practices.
- Ignoring human factors such as burnout, context switching, and skills.
- Gaming or overfocusing on a single metric, leading to perverse incentives.
- Skipping stakeholder alignment, which undermines adoption.
- Optimizing a single team while shifting bottlenecks elsewhere.
PMP Example Question
While monitoring resource performance, you see long QA queues and frequent overtime for testers. What should you do first to apply continuous improvement?
- Hire two more testers immediately to remove the bottleneck.
- Replace the test management tool across all teams this month.
- Run a small, time-boxed experiment to reduce QA WIP and pair developers with testers, then measure the effect.
- Issue a directive to the QA lead to eliminate overtime by end of week.
Correct Answer: C — Run a small, time-boxed experiment to reduce QA WIP and pair developers with testers, then measure the effect.
Explanation: Continuous improvement favors low-risk, data-driven tests before scaling. Options A and B are large, costly changes without evidence. Option D mandates an outcome without addressing root causes.
HKSM