Outputs from other processes
A technique that analyzes artifacts produced by other processes to inform the current process or decision. It promotes consistency, traceability, and timely alignment across project areas.
Key Points
- This technique uses artifacts from other processes (plans, baselines, logs, reports, deliverables) to inform current analysis.
- It drives alignment across scope, schedule, cost, quality, risk, procurement, and change control.
- Effective use depends on configuration management and version control to avoid outdated information.
- Traceability and context (owner, date, purpose) are essential for correct interpretation.
- Applied iteratively at reviews, decision points, and throughout delivery.
- Typically results in documented findings, updates, and change requests based on integrated evidence.
Purpose of Analysis
To ensure decisions and plans are based on the most current, reliable information produced across the project. By linking outputs from multiple processes, the team reduces rework, detects conflicts early, and maintains a coherent, end-to-end view of performance and change impacts.
Method Steps
- Identify the decision or analysis objective and criteria.
- List relevant processes and inventory their outputs with metadata (version, date, owner, approval status).
- Verify completeness and quality; request missing or corrected artifacts as needed.
- Analyze dependencies, variances, trends, and conflicts across outputs.
- Synthesize findings into options, recommendations, and impacts.
- Record updates to plans and registers; raise change requests where required.
- Communicate conclusions to stakeholders and capture lessons learned.
Inputs Needed
- Current analysis objective and decision criteria.
- Outputs from other processes, such as: change log, issue log, risk register, schedule and performance data, cost estimates and reports, scope baseline and WBS, quality metrics, deliverable acceptance records, procurement documents, stakeholder register, and decision log.
- Configuration management system or repository with version history.
- Applicable policies, thresholds, and governance rules.
- Access to process owners or subject matter experts for clarification.
Outputs Produced
- Consolidated, validated set of relevant outputs with references and versions.
- Documented analysis findings, assumptions, and implications.
- Recommended actions and decisions for the current process.
- Updates to plans, registers, and reports; baseline changes if approved.
- Change requests, risk/issue updates, and lessons learned entries.
Interpretation Tips
- Always confirm the latest approved version using configuration IDs or dates.
- Review context: why the output was created, by whom, and under which assumptions.
- Cross-check for internal consistency across scope, schedule, cost, and quality data.
- Distinguish raw data from analyzed information; validate calculations and sources.
- Align interpretations with governance thresholds and acceptance criteria.
- Resolve conflicts via integrated change control when impacts are material.
Example
While refining the risk register, the project manager reviews the change log, recent defect trends, and updated schedule. A new change increased testing scope by 20%, extending the critical path and elevating resource risk. The manager adds new risks, updates response plans, adjusts the schedule, and raises a change request to secure additional testing capacity.
Pitfalls
- Using outdated or draft artifacts due to weak version control.
- Over-collecting irrelevant documents, causing analysis paralysis.
- Lack of traceability between outputs and requirements or baselines.
- Ignoring informal decisions that affect formal outputs.
- Confirmation bias when interpreting metrics and reports.
- Failing to involve process owners to validate meaning and implications.
PMP Example Question
While performing cost variance analysis, the project manager wants to ensure the assessment reflects the current project state. What should the manager do first?
- Gather and review the latest schedule updates, change log, and performance reports from other processes.
- Update the cost baseline to match the most recent actual costs.
- Ask team leads for their opinions on likely cost drivers.
- Defer the analysis until the next reporting cycle to avoid rework.
Correct Answer: A — Gather and review the latest schedule updates, change log, and performance reports from other processes.
Explanation: The technique relies on using outputs from other processes to inform current analysis. Reviewing validated, up-to-date artifacts ensures accurate and aligned cost variance conclusions.
HKSM