precision

In quality management, precision describes the degree of exactness or fineness in results or measurements.

Key Points

  • Precision focuses on how exact and consistent results or measurements are.
  • High precision does not guarantee accuracy; values can be exact yet off from the true or target value.
  • Quality control tools (e.g., repeated measurements, control charts) help assess precision by showing low variation.
  • Requirements may specify precision tolerances (e.g., record to 0.01 units) to guide verification and testing.

Example

During performance testing, five runs show response times of 2.01 s, 2.00 s, 2.02 s, 2.01 s, and 2.00 s. The results are tightly clustered, indicating high precision, even if the target SLA is 1.50 s (which would be an accuracy concern).

PMP Example Question

A QA analyst notes that a measurement device consistently reports values 10 mm above the specification, with almost no variation across repeated checks. What quality characteristic is demonstrated?

  1. Accuracy
  2. Precision
  3. Prevention cost
  4. Conformance

Correct Answer: B — Precision

Explanation: The readings are consistent and tightly grouped (high precision) but not close to the true or target value (low accuracy).

Advanced Lean Six Sigma — Data-Driven Excellence

Solve complex problems, reduce variation, and improve performance with confidence. This course is designed for professionals who already know the basics and want to apply advanced Lean Six Sigma tools to real business challenges.

This is not abstract statistics or theory-heavy training. You’ll use Excel to perform real analysis, interpret results correctly, and apply tools like DMAIC, SIPOC, MSA, hypothesis testing, and regression without memorizing formulas or relying on expensive software.

You’ll learn how to measure baseline performance, analyze process capability, use control charts to maintain stability, and validate improvements using statistical evidence. Templates, worked examples, and structured walkthroughs help you apply each concept immediately.

Learn through a complete, real-world Lean Six Sigma project and develop the skills to lead data-driven improvements with credibility. If you’re ready to move beyond basics and make decisions backed by data, enroll now and take your Lean Six Sigma expertise to the next level.

Explore the Course


Take Control of Project Performance!

HK School of Management helps you go beyond status reports and gut feelings. In this advanced course, you will learn Earned Value Management (EVM) to measure progress, forecast outcomes, and take corrective action. Learn how WBS quality drives performance, how control accounts work, and how to use EAC, TCPI, and variance analysis. Practical skills, tools, and guidance you can apply right away. Covered by Udemy's 30-day refund policy.

Learn More