Skip to main content
HKSM Knowledge Centre

OT/ICS Cybersecurity

Understand threats, controls, and management decisions affecting operational technology and industrial control systems.

28 articles

Flat vector illustration of an industrial plant with tanks and striped chimneys at the centre of a circular calendar wheel, ringed by teal and orange outage arcs and four season segments marked by snowflakes, leaves, a sun and autumn leaves
10 min read

A Year of OT Drills Built Around Your Outages

Twelve months, four outages, one calendar. A sample OT drill year filled in the order a plant actually works: outage dates first, then blackouts, compliance clocks, four quarterly events and a monthly call-list check on a different shift each time.

  • OT Security
  • ICS Security
  • Incident Response
Read article
A bright modern process facility interior with polished stainless steel pipework and vessels running in clean lines under daylight
13 min read

What Actually Stopped the Big OT Attacks Wasn't a Security Product

In every well-documented OT incident where the damage was limited, the limiting factor was operational: manual operation, tested offline backups, a human watching a screen, or the attacker's own bug. What that should change about the order you build controls in.

  • OT Security
  • ICS Security
  • Critical Infrastructure
Read article