ICS/OT Incident Response Drills and Exercises
ICS/OT Incident Response Drills and Exercises
Design the Drill. Run the Room. Prove the Plan.
Most industrial sites have an incident response plan. Very few have tested it where it matters: on the plant floor, with operators in the room and the process still running. ICS/OT Incident Response Drills and Exercises shows OT engineers, security leads, and IT professionals how to turn a plan on paper into a capability that holds up at 2 a.m., in front of an auditor, and during a real attack.
What This Book Delivers
- A plan built for OT. Safe state, manual fallback, decision authority, and the escalation path that a generic IT plan leaves out.
- Exercises that expose real gaps. Executive and technical tabletops, escalating scenarios, the CISA exercise library, and the five scenario types every OT team should drill.
- Regulatory evidence that survives an audit. NERC CIP-008-6 and TSA pipeline testing and reporting obligations, and the records auditors actually ask for.
- Improvement that sticks. HSEEP after-action reports, improvement plans that get closed, drill metrics that matter, and backups you can actually restore.
- A program, not an event. A 12-month drill cadence, two real incidents told from the responder's side, and a full worked exercise.
- Drills you design and run yourself. A six-step method for a 15-minute drill on one card, three worked drill cards, a full tabletop built step by step, how to run the room when it goes quiet or off track, and how to prove a fix by running the same drill twice.
Who It's For
- OT and control systems engineers and automation technicians responsible for incident response at their site.
- OT security leads who must design, run, and evaluate exercises and prove the results.
- IT security professionals extending incident response into industrial environments.
How It's Structured
- Chapters 1-4: the plan you are testing — why untested plans fail, the OT incident response lifecycle, safe state, and detection.
- Chapters 5-11: designing and running exercises, communication and regulation, after-action improvement, recovery, and the yearly cadence.
- Chapters 12-14: two real incidents and a complete worked exercise that brings every chapter together.
- Chapters 15-19: design and run your own drills — the 15-minute drill card, a tabletop in six steps, running the room, and running it twice.
Read the free preview. The introduction and chapters 1–3 are available without an account. Get the full digital book and worksheets for US$9.99.
Get the Full Book Read the Free PreviewOn the ICS and OT security path
This book goes with ICS/OT Incident Drills and Tabletop Exercises
Read the book, then practise with the course. See the whole path
Agile Project Management & Scrum — With AI
Ship value sooner, cut busywork, and lead with confidence. Whether you’re new to Agile or scaling multiple teams, this course gives you a practical system to plan smarter, execute faster, and keep stakeholders aligned.
This isn’t theory—it’s a hands-on playbook for modern delivery. You’ll master Scrum roles, events, and artifacts; turn vision into a living roadmap; and use AI to refine backlogs, write clear user stories and acceptance criteria, forecast with velocity, and automate status updates and reports.
You’ll learn estimation, capacity and release planning, quality and risk management (including risk burndown), and Agile-friendly EVM—plus how to scale with Scrum of Scrums, LeSS, SAFe, and more. Downloadable templates and ready-to-use GPT prompts help you apply everything immediately.
Learn proven patterns from real projects and adopt workflows that reduce meetings, improve visibility, and boost throughput. Ready to level up your delivery and lead in the AI era? Enroll now and start building smarter sprints.
Explore the CourseTake Control of Project Performance!
HK School of Management and Technology helps you go beyond status reports and gut feelings. In this advanced course, you will learn Earned Value Management (EVM) to measure progress, forecast outcomes, and take corrective action. Learn how WBS quality drives performance, how control accounts work, and how to use EAC, TCPI, and variance analysis. Practical skills, tools, and guidance you can apply right away. Covered by Udemy's 30-day refund policy.
Learn More