HKSM › Books › ICS/OT Incident Response Drills and Exercises › ICS/OT Incident Response Drills and Exercises

ICS/OT Incident Response Drills and Exercises

ICS/OT Incident Response Drills and Exercises — Book Cover

ICS/OT Incident Response Drills and Exercises

Design the Drill. Run the Room. Prove the Plan.

Most industrial sites have an incident response plan. Very few have tested it where it matters: on the plant floor, with operators in the room and the process still running. ICS/OT Incident Response Drills and Exercises shows OT engineers, security leads, and IT professionals how to turn a plan on paper into a capability that holds up at 2 a.m., in front of an auditor, and during a real attack.

What This Book Delivers

  • A plan built for OT. Safe state, manual fallback, decision authority, and the escalation path that a generic IT plan leaves out.
  • Exercises that expose real gaps. Executive and technical tabletops, escalating scenarios, the CISA exercise library, and the five scenario types every OT team should drill.
  • Regulatory evidence that survives an audit. NERC CIP-008-6 and TSA pipeline testing and reporting obligations, and the records auditors actually ask for.
  • Improvement that sticks. HSEEP after-action reports, improvement plans that get closed, drill metrics that matter, and backups you can actually restore.
  • A program, not an event. A 12-month drill cadence, two real incidents told from the responder's side, and a full worked exercise.
  • Drills you design and run yourself. A six-step method for a 15-minute drill on one card, three worked drill cards, a full tabletop built step by step, how to run the room when it goes quiet or off track, and how to prove a fix by running the same drill twice.

Who It's For

  • OT and control systems engineers and automation technicians responsible for incident response at their site.
  • OT security leads who must design, run, and evaluate exercises and prove the results.
  • IT security professionals extending incident response into industrial environments.

How It's Structured

  • Chapters 1-4: the plan you are testing — why untested plans fail, the OT incident response lifecycle, safe state, and detection.
  • Chapters 5-11: designing and running exercises, communication and regulation, after-action improvement, recovery, and the yearly cadence.
  • Chapters 12-14: two real incidents and a complete worked exercise that brings every chapter together.
  • Chapters 15-19: design and run your own drills — the 15-minute drill card, a tabletop in six steps, running the room, and running it twice.

Read the free preview. The introduction and chapters 1–3 are available without an account. Get the full digital book and worksheets for US$9.99.

Get the Full Book Read the Free Preview

AI Systems with Claude, for Scrum Masters and Project Managers

Most AI pilots in project management do not fail on the model. They fail because somebody pointed the thing at a decision instead of at a task. This course is built around that distinction, and around the work that follows once you get it right.

Eight teaching sections, taught against one running project from the first lecture to the last. You watch a system get built, then you build the same one against your own sprint. Nothing here is a demo that works only on the example.

You finish with five working systems and you keep them. The sprint report machine turns your board export and standup notes into the report you currently write by hand. The retro intelligence system tells you what the team keeps saying, not just what it said this time. The stakeholder comms engine drafts the update in the register the audience expects. The backlog health monitor flags the quiet decay nobody has time to check for. The risk and dependency tracker follows the chains that actually bite.

Seventy-six working files ship with it, across four sections, so every system is built against real sprint data rather than material invented for a slide. Four sprints of retrospectives, board exports, standup notes, backlog and risk data.

Explore the Course


Lead with clarity, influence, and outcomes.

HK School of Management and Technology offers a practical Leadership for Project Managers course for real projects, tight deadlines, and cross-functional teams. Learn to set direction, align stakeholders, and drive commitment without relying on title. Practical skills, tools, and guidance you can apply right away. Covered by Udemy's 30-day refund policy.

Learn More