OT/ICS Cybersecurity

Understand threats, controls, and management decisions affecting operational technology and industrial control systems.

28 articles

Night-shift control room seen from behind two people: an operator in a hi-vis jacket at a panel of gauges and switches, and an interviewer beside him holding a notebook, with the lit plant visible through the window
9 min read

The Interview That Finds What Your OT Incident Response Plan Is Missing

Ask the day and night supervisors who can stop the plant for a cyber reason, and you may get two answers. Before you write a word of the incident response plan, run a 30-minute interview: three questions, two follow-ups each, and a findings log that turns every answer into a requirement.

  • OT Security
  • ICS Security
  • Incident Response
Read article
3D render of a scatter of stopwatches and mechanical timers on a dark control-room desk, each hand at a different position, with an industrial plant lit up at night in the background
9 min read

Who You Have to Tell After an OT Cyber Incident, and How Fast

One incident can start several reporting clocks, and they do not start at the same moment: one counts from determination, another from identification, another from becoming aware. A ten-column notification matrix row for your OT plan, seeded with dated clocks for the US, EU, Canada and Australia.

  • OT Security
  • ICS Security
  • Incident Response
Read article
A papercraft test bench with a controller rack, HMI panel and server tower joined by paper cables, beside a large red stopwatch. A port with cranes and container ships is visible behind it.
10 min read

The Restore Drill: Prove Your OT Backup Works Before You Need It

Maersk's whole recovery from NotPetya hung on one domain controller in Ghana that a blackout had switched off. Luck is not a backup design. A bench drill for one controller project, one HMI and one historian, timed lap by lap, with a strict pass line.

  • OT Security
  • ICS Security
  • Incident Response
Read article
A high-voltage substation on an overcast winter evening, snow on the ground, an open gate and wet road reflecting the transmission towers, with a lit control building and security cameras on poles
10 min read

Industroyer2 Never Fired: Run the Near-Miss as a 90-Minute Tabletop

In April 2022, Industroyer2 was scheduled to hit a Ukrainian energy company's substations at 16:10 UTC. It never ran. CERT-UA and ESET published the record within days. Here it is as a seven-block tabletop: what your team knows, the decision it faces, and what the real defenders did.

  • OT Security
  • ICS Security
  • Incident Response
Read article
Watercolor and ink illustration of an open ruled notebook with a large steel wrench lying across its pages, on a worn metal workbench in a plant with pipes, a valve wheel and lit control cabinets behind
10 min read

The Exercise Found the Gap. The After-Action Report Lost It.

Most OT exercise reports are filed and forgotten, so the same finding comes back next year. A worked improvement plan with four rows, built on FEMA's HSEEP format, and the one rule that makes findings actually close: write the re-test before you write the fix.

  • OT Security
  • Incident Response
  • Tabletop Exercises
Read article
A thick stack of financial papers on a dark metal workbench under a narrow spotlight, beside a pen and a calculator, with a large idle factory gear and an empty production line fading into a dim hall behind
10 min read

What a Cyber Shutdown Cost Three Manufacturers, in Their Own Filings

Molson Coors, Clorox and Brunswick each filed two numbers for their cyber incidents. The one labelled as the incident's cost was the small one. The big one was lost production days. A one-page worksheet prices a lost day at your own site, for the budget meeting where exercise time gets cut.

  • OT Security
  • Incident Response
  • Manufacturing
Read article